Skip to main content

Please be aware the content below has been generated by an AI model from a source PDF (opens in new tab) .

Yorkshire Dales National Park Authority

Local Plan

2025–2040

IMAGE: Cover showing the words “Yorkshire Dales National Park Authority”, “Local Plan” and “2025 - 2040”, over a photograph of a Yorkshire Dales valley with green hills, stone buildings and a village. The Yorkshire Dales National Park Authority logo appears at the bottom.

The Local Plan was adopted on 30 June 2026.

The Yorkshire Dales National Park Local Plan sets out the strategy and policies for the development and use of land during the period up to 2040. The Local Plan is accompanied by a policies map that provides the spatial expression of some of the policies. Numerous maps show land designations such as important open space, ecological networks and Conservation Areas. They also show housing development boundaries and land allocated for future development. The policies map can be found on the National Park Authority’s website: www.yorkshiredales.org.uk/planning/planning-policy/local-plan-2025-40/policies-maps/

Contents

    1. Introduction — 2
    1. The Yorkshire Dales National Park – a portrait — 7
    1. Vision — 21
    1. Core Policies
      • CP1 Sustainable development — 24
      • CP2 National Park purposes — 27
      • CP3 Spatial strategy and housing target — 29
      • CP4 Flood risk — 38
      • CP5 Sustainable drainage – foul and surface water — 41
      • CP6 Design — 47
      • CP7 Energy requirements — 53
      • CP8 Landscape character — 57
      • CP9 Biodiversity conservation and enhancement — 59
      • CP10 Major development — 61
    1. Infrastructure, Access & Connectivity
      • AC1 Infrastructure needed to support development — 64
      • AC2 New and improved infrastructure — 67
      • AC3 Sustainable travel and vehicle movements — 69
      • AC4 Development within railway corridors — 72
    1. Archaeology & Built Heritage
      • AB1 Heritage assets — 76
      • AB2 Conversion of traditional buildings - acceptable uses — 81
      • AB3 Conversion of traditional buildings - building treatment — 85
      • AB4 Demolition and alteration of traditional farm buildings — 87
    1. Community
      • C1 Housing in towns and large villages — 91
      • C2 New build housing in small settlements — 101
      • C3 Rural exceptions sites — 102
      • C4 Rural workers’ dwellings — 104
      • C5 Shared housing, sub-division, residential annexes and replacement dwellings — 107
      • C6 Residential caravans, Gypsy and Traveller needs — 110
      • C7 Accommodation for elderly and vulnerable adults — 112
      • C8 Community facilities — 114
      • C9 Important open space — 117
      • C10 Waste management — 119
    1. Economy
      • E1 Business development sites — 123
      • E2 Rural land-based enterprises — 126
      • E3 Re-use of existing buildings and brownfield land — 130
      • E4 High street and retail uses — 132
      • E5 Safeguarding existing employment and tourism uses — 135
      • E6 Rural estate plans — 138
      • E7 Live/work units — 139
      • E8 Camping and touring caravan sites — 142
      • E9 Non-permanent self-catering visitor accommodation — 146
      • E10 Visitor infrastructure — 149
      • E11 Visitor facilities — 152
      • E12 Bolton Abbey Core Visitor Area — 155
      • E13 Staff accommodation — 157
    1. Landscape
      • L1 Crushed rock quarrying — 161
      • L2 Building stone — 165
      • L3 Re-working mineral waste — 167
      • L4 The open upland — 168
      • L5 Mineral safeguarding — 169
      • L6 Dark night skies — 170
    1. Natural Environment
      • NE1 Protecting wildlife sites, species and networks — 174
      • NE2 Protecting irreplaceable habitat, trees, hedgerows and walls — 181
    1. Monitoring & implementation — 186
  • Glossary of terms — 188
  • Appendices
      1. Special Qualities of the National Park — 198
      1. Existing Local Plan documents to be replaced on adoption of the Yorkshire Dales Local Plan 2025-2040 — 202
      1. Design guidelines — 203
      1. Allocated housing and employment sites — 206
      1. Heads of Terms. Local Plan housing site briefs — 212
      1. Housing value areas — 214
      1. Affordable housing — 215
      1. Local occupancy housing — 217
      1. Principal residency — 219
      1. Phosphate and nitrogen mitigation — 220

1. Introduction

What is the Local Plan?

1.1

The Local Plan is the statutory development plan for the Yorkshire Dales National Park. It sets out how the National Park Authority will plan for and manage development in the period up to 2040. It will be used to guide day-to-day decisions on planning applications and other proposals for development.

1.2

The new Local Plan presents a single set of planning policies for the whole of the National Park for the first time since the extension of its boundary in August 2016.

What does it seek to achieve?

1.3

The aim of the Local Plan is to contribute to the achievement of sustainable development. It will do this by guiding the type and location of new development to deliver long-term benefits for the community, the economy and the environment.

1.4

The Local Plan is written within the context of the two statutory purposes of National Parks 1. These are:

  • to conserve and enhance the natural beauty, wildlife and cultural heritage of the National Park; and
  • to promote opportunities for the understanding and enjoyment of the special qualities of the National Park by the public.

1.5

The National Park Authority also has a statutory duty to seek to foster the economic and social well-being of communities within the area 2. The Local Plan will manage growth to ensure that the two statutory purposes are met while also meeting the local development needs of the economy and the social well-being of local communities.

1.6

The preparation of the Local Plan is a statutory responsibility of the National Park Authority in accordance with the National Planning Policy Framework (NPPF). The NPPF is the main statement of Government planning policy in England. It provides a structure within which local plans are prepared and sets out expectations as to what the Local Plan should aim to achieve, taking account of local circumstances, needs, character, and opportunity.

1.7

The Local Plan also has a role to help deliver the ambitions set out in the Yorkshire Dales National Park Management Plan 3, and its subsequent revisions. The Management Plan is the single most important strategy for the National Park and is also a material consideration in decision-making on planning applications 4. It sets out the vision, strategic policies and intended outcomes up to 2040. It aims to ensure that the National Park purposes are achieved. The Management Plan is prepared and implemented by a partnership of statutory environmental bodies, landowners, representatives of local business, local councils, the voluntary sector and the National Park Authority. The Management Plan is reviewed every five years with the latest review having begun in 2024.

How has the Local Plan been prepared?

1.8

Work on the preparation of the Local Plan began in 2018. Its development has been informed by a series of reports (the evidence base) commissioned by the Yorkshire Dales National Park Authority and its partners. These include:

  • Demographic Evidence Report, October 2019
  • Strategic Housing Market Assessment, November 2019, reviewed July 2024
  • Socio-economic Wellbeing Assessment, November 2019
  • Landscape Character Assessment, 2020
  • Yorkshire Dales National Park First Homes Analysis, February 2022
  • Yorkshire Dales National Park Economic Viability Assessment, April 2022, reviewed February 2025
  • Level 1 Strategic Flood Risk Assessment, June 2022
  • Housing Land Availability Assessment, March 2023, reviewed February 2025

1.9

Engagement has been an essential part of the preparation process in accordance with the National Park Authority’s Statement of Community Involvement in Planning 5. There have been seven ‘informal’ stages of consultation with a wide range of local organisations, stakeholders and residents. The process has been iterative, helping to shape the issues covered by the Local Plan, guiding how ambitious the strategy should be, and informing the detail and justification of its policies.

1.10

To ensure that issues of sustainability, equality and the precautionary principle have been considered, the Local Plan is also supported by a Sustainability Appraisal, a Habitats Regulations Assessment and an Equalities Impact Assessment.

How does it fit with other authorities, plans and strategies?

1.11

The boundary of the National Park overlies part of four local authority areas. North Yorkshire Council, Westmorland and Furness Council, Lancaster City Council and Lancashire County Council are responsible for a wide range of functions inside the National Park, including economic development, transport, education and adult services, waste management, surface water flood protection and provision of services such as affordable housing.

1.12

Local government reorganisation in April 2023 combined several smaller authorities to create a simpler administrative structure. Six former councils which previously covered areas of the National Park in Cumbria and North Yorkshire 6 were replaced by two new unitary bodies – Westmorland and Furness Council and North Yorkshire Council. Across North Yorkshire a new combined authority was also created in April 2024 in partnership with the City of York. Its role is to use some of the money and power currently held by central government to devolve a range of functions, including issues around the supply and quality of housing, transport, community safety and associated infrastructure.

1.13

Both new authorities are working to produce their own local plans for their areas outside the National Park. The part of the National Park within Lancashire remains unchanged by reorganisation and is covered by two tiers of local government in the form of Lancaster City Council and Lancashire County Council.

1.14

The National Park Authority has a ‘duty to co-operate’ with these and a range of other organisations, to make sure its Local Plan is aligned and that it is engaging constructively on cross-boundary matters.

1.15

The Local Plan is legally required to accord with the government’s National Planning Policy Framework and to have regard to its planning guidance, which are also material considerations in making decisions on planning applications.

1.16

Several neighbourhood plans cover parishes inside the National Park and provide additional detailed local planning policy that helps guide decision-making.

1.17

The Yorkshire Dales National Park Design Guide 7 is a supplementary planning document adopted in 2026. It provides detailed advice for those seeking planning permission about the form of development that is likely to be acceptable. It is a material consideration in determining planning applications and should be read in conjunction with the design policies in this Local Plan.

1.18

This Local Plan supersedes the eleven Local Plan documents that previously covered different parts of the National Park 8.

What is the structure of the Local Plan?

1.19

The Local Plan is arranged as follows:

  • Chapter 2: The Yorkshire Dales National Park – a portrait – This chapter provides a description of the Local Plan area. It outlines the overarching strategy and identifies the economic, social and environmental needs and opportunities that the Plan is seeking to address.
  • Chapter 3: Vision – This chapter sets out how the National Park is intended to evolve over the Local Plan period, from 2025 to 2040.
  • Chapter 4: Core policies – This chapter covers the strategic policies which set out the overarching principles for development. This includes a spatial strategy and policies which seek to secure sustainable development and the protection and enhancement of the special qualities of the National Park. The core policies apply to all new development.
  • Chapters 5–10: Thematic policies – These chapters contain the detailed policies that will be used to shape types of development over the Local Plan period. They cover infrastructure, access and connectivity; archaeology and built heritage; communities; the economy; landscape; and the natural environment. Each policy includes an aim and a justification. The aim describes the intended outcome, and the justification provides the context and reasoning for the policy, together with an explanation of how it may be used. The justification may also link to specific evidence and cross reference to other related policies.
  • Chapter 11: Monitoring and implementation – This chapter outlines how some of the main delivery and outcomes of the Local Plan will be monitored.
  • Glossary of terms – The glossary provides an explanation of certain terms, in the context of the Local Plan.
  • Appendices – The appendices set out further technical detail and guidance to support the policies.

1.20

The Local Plan is supported by a detailed Policies Map, consisting of a series of inset maps, which shows where certain policies and proposals apply. The map identifies all of the site allocations and designations that are most relevant to the determination of planning applications (excluding those in neighbourhood plans).

Using the Local Plan

1.21

All the relevant policies will be taken into account when considering planning applications. It is therefore important that the Local Plan is read as a whole and that the policies, aims and objectives are viewed together and not in isolation.

1.22

The Local Plan should be used in combination with the National Planning Policy Framework and other relevant national guidance. Where necessary, it should also be used alongside other relevant material planning considerations, including the National Park Management Plan. Policies within up-to-date neighbourhood plans will also be used to guide local development decisions.