Skip to main content

Please be aware the content below has been generated by an AI model from a source PDF (opens in new tab) .

Creation of NEW BRIDLEWAYS at High & Low Greenfield, Beckermonds and Cam Woodlands, Oughtershaw - together with NEW FOOTPATHS at Low and High Greenfield Lings

Scale 1:25000

IMAGE: Ordnance Survey map covering High and Low Greenfield, Beckermonds, Cam Woodlands, Oughtershaw, and Greenfield Lings. The map shows the locations and routes of the proposed new bridleways and footpaths, marked with broad black-and-white dashed lines, including routes through Cam Woodlands, Beckermonds Scar, High Green Field Lings, and Low Green Field Lings. Map labels include “High Green Field Lings”, “Low Green Field”, “Cam Woodlands”, “Beckermonds Scar”, “Oughtershaw”, “Swarthgill”, “Cam Fell”, and “Greenfield”. The map scale is 1:25000.

© Crown copyright and database rights 2022 Ordnance Survey 100023740

NOTICE OF DEDICATION OF A PUBLIC BRIDLEWAY AND A PUBLIC FOOTPATH

BRIDLEWAY NO. 26 in the PARISH OF BUCKDEN

at High and Low Green Field, Beckermonds, Langstrothdale

and

FOOTPATH NO. 25 in the PARISH OF BUCKDEN

at Low Green Field Lings, Beckermonds, Langstrothdale

Take notice that by Deed dated the 31 March, 2017, the rights of way described below at High and Low Green Field, Beckermonds, Langstrothdale, Buckden, North Yorkshire have been dedicated for use by the public as Bridleway and Footpath.

The effect of the dedication for Bridleway No. 26, Buckden is to create a new route from the county road, east of Low Green Field at Grid Reference SD 8507 8022, to a bridle-gate and along the track in an east, north easterly direction for approx. 1km to the junction of a footpath at GR SD 8605 8048, continuing along the track north, north east before bearing westerly along Beckermonds Scar to its junction with Footpath No. 25 at GR SD 8386 8038 and continuing south westerly for approx. 2.4 km crossing another footpath and following the track south, south easterly to join the Byways at Grid Reference SD 8226 7843. Approximate length 6.9 km.

The effect of the dedication for Footpath No. 25 Buckden is to create a new route from its junction with Bridleway No. 26, Buckden, on the track at Grid Reference SD 8386 8038 west, north west to a kissing gate at GR SD 8337 8053 and its junction with the Parish Boundary and Footpath No. 3, Horton-in-Ribblesdale at Grid Reference SD 8336 8054. Approximate length 0.5 km.

Dated: 4 August, 2022

CLARE BEVAN (Solicitor)
Yorkshire Dales National Park Authority
Bainbridge

Partially visible notice

IMAGE: The right-hand side of the page contains a second notice of dedication concerning bridleways at Cam Woodlands and High Green Field Lings. The supplied scan cuts off the right side of this notice, so much of its heading and route descriptions is not legible. The visible text reads:

NOTICE OF DEDICATION OF A PU[blic notice text cut off]

BRIDLEWAY NOS. [text cut off]
in the PARISH O[ text cut off]
at Cam W[oodlands; text cut off]

BRIDLEWAY NOS. 27[ text cut off]
at High Green Field Li[ngs; text cut off]

Take notice that by Deed dated the 21 Ma[rc[h, 2017; text cut off] Woodlands, Oughtershaw, Horton-in-Ribb[lesdale,] Langstrothdale, Buckden, North Yorkshire [have been dedicated for use by the public as Bridleway] and Footpath.

The effect of the dedication for Bridlew[ay No. ... is to create a new] route from the Restricted Byway at Wes[t ...] bridle-gate and continuing in an east, north [east direction, then] south, south east following the track for app[rox. ...] 350 metres, continuing along the track in a[n easterly direction to GR ...] 8111 and remaining on the track south, sou[th east until the ...] track curves east, north east to its junction w[ith ...] track south, south east to its junction with B[... the] Parish Boundary and junction with Bridlewa[y ...] Approximate Length: 3.45 km

The effect of the dedication for Bridlewa[y ... is to create a new] route from Bridleway No. 74, at Grid Ref[erence ...] GR SD 8295 8039 and turning in a souther[ly direction to ...] Bridleway No. 28 at Grid Reference SD 829[...].

The effect of the dedication for Footpat[h ... is to create a new] route from its junction with Bridleway N[o. ...] passing to the southern side of the pond an[d continuing] northerly to join an existing Footpath at Gr[...]. Approximate length: ... km

The effect of the dedication for Bridlewa[y ... is to create a new] junction with Bridleway Nos. 74 and 28, [then] following the track in a south westerly direc[tion to Grid Reference SD ...] 7965. Approximate Length: 0.700 km

The effect of the dedication for Bridlewa[y ... is to create a new] junction with Bridleway Nos. 74 and 27, [then] north east for approx. 30 metres to its junct[ion at Grid Reference ...] SD 8298 8023 and bearing south, south eas[t to Grid Reference ...] 7989. Approximate Length: 0.385 km

Dated: 4 August, 2022