Item 6 – Statement of Final Accounts 2024/25
Yorkshire Dales National Park Authority
Finance & Resources Committee
24 February 2026
Statement of Final Accounts 2024/25
Item 6
Purpose of the Report
- To present the external auditors Audit Completion Report findings for 2024/25, and to obtain Members approval for the revised Statement of Accounts (SoFA).
Recommendations
- That Members: a. Note the Audit Completion Report (Appendix 1) b. Approve that the Chair of the F&R Committee sign the final SoFA for 2024/25. (Appendix 2) c. Approve that the Chair of the F&R Committee co-sign the letter of representation, along with the Treasurer (Appendix 3)
Strategic Framework
- The information and recommendations contained in this report are consistent with the Authority’s statutory purposes and support the strategic planning framework:
- Corporate Plan Objective 30: Operate governance arrangements that are fit for purpose, as reported through the Annual Governance Statement and the Annual Governance Report.
Background
- External audits are required annually, the Accounts and Audit Regulations 2015 require the Treasurer to sign and date the pre-audit SoFA, certifying that it represents a true and fair view of the financial position of the Authority.
- The draft SoFA for 2024/25 was signed by the Treasurer and made available on the Authority’s Website on 24 June 2025. Following the audit, the final SoFA for 2024/25 will be re-signed on 24 February 2026 (Appendix 2).
- The audit timetable was modified by Government, this requires publication of the final 2024/25 accounts by 28 February 2026.
- The Audit Completion Report presented by Forvis Mazars gives a summary of the audit for 2024/25 (Appendix 1).
- Members will be aware that the previous two years SoFA’s have received disclaimed opinions due to the missing audit in 2022/23.
- In order to get the Authority back on track, the audit for 2024/25 also included a full audit of the year 2022/23 to build back assurances of the balances in that year.
- There are no differences between the figures in the draft SoFA and the final SoFA for 2024/25 but there are some presentational changes, mainly due to the prior year restated figures which required more explanation and reference, see note 5 in the SoFA.
Statement of Final Accounts
- The format and content of the SoFA (Appendix 2) must comply with the CIFPA Code of Practice on Local Authority Accounting in the United Kingdom: A Statement of Recommended Practice (SORP) and is therefore largely outside the control of this Authority. The SORP sets out the proper accounting practice required for the SoFA within the statutory framework of the Accounts and Audit Regulations 2015 and the Local Government and Housing Act 1989.
- An unqualified audit opinion has been received for 2024/25 from Forvis Mazars LLP.
Financial Implications
- The budget for 2024/25 audit was £48k. The 2022/23 Value for Money work was completed and charged already by Ernst & Young, but the additional audit work for 2022/23 will attract a fee for the hours worked, so the final charge for the 2024/25 audit will be in the region of £80k to £85k.
Legal Implications
- None.
Equality, Diversity and Inclusion Implications
- None.
Michelle Clyde Head of Finance
[Image: Page 3 is a title slide for an audit report. It features a wide banner image of a modern building's glass facade reflecting a sunset sky with hues of purple, orange, and blue. The text reads: "Audit Completion Report, Yorkshire Dales National Park Authority – year ended 31 March 2025, 20 February 2026." The "forvis mazars" logo is in the bottom right corner.]
Forvis Mazars Bank Chambers 26 Mosley Street Newcastle upon Tyne NE1 1DF
Members of the Finance & Resources Committee Yorkshire Dales National Park Authority Yoredale Bainbridge North Yorkshire DL8 3EL
20 February 2026
Dear Committee Members
Audit Completion Report – Year ended 31 March 2025
We are pleased to present our Audit Completion Report for the Yorkshire Dales National Park Authority (the Authority) for the year ended 31 March 2025. The purpose of this report is to summarise our audit findings and conclusions.
This report is intended solely for the Members of the Finance & Resources Committee for the purpose of communicating certain matters that, in our professional judgement, are relevant to your oversight of the financial reporting process. To the fullest extent permitted by law Forvis Mazars LLP accepts no responsibility and disclaims all liability to any third party who purports to use or rely for any reason whatsoever on the report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification. Accordingly, any reliance placed on the report, its contents, conclusions, any extract, reinterpretation, amendment and/or modification by any third party is entirely at their own risk.
We appreciate the courtesy and co-operation extended to us by the Authority throughout our audit. We would be happy to discuss the contents of this report, or any other matters regarding our audit, with you in more detail.
Yours faithfully
Gavin Barker Forvis Mazars LLP
Contents
01 Executive summary 02 Status of our audit 03 Audit approach and risk summary 04 Significant findings 05 Significant control deficiencies 06 Summary of misstatements 07 Fraud considerations 08 Value for Money
A Appendix A: Internal control conclusions B Appendix B: Draft management representation letter C Appendix C: Draft audit report D Appendix D: Confirmation of our independence E Appendix E: Other communications
01 Executive Summary
Scope
We have been engaged to audit the financial statements of the Yorkshire Dales National Park Authority (the Authority) for the year ended 31 March 2025 which are prepared in accordance with the 2024/25 Code of Practice on Local Authority Accounting.
We have conducted our audit in accordance with International Standards on Auditing (UK) (‘ISAs’), relevant ethical and professional standards, our own audit methodology and in accordance with the Code of Audit practice.
Impact of the disclaimed audit opinions for 2023/24 on the 2024/25 audit
Members will recall that we carried out a full audit of the 2023/24 financial statements. However, we were unable to obtain assurance regarding the opening balances in advance of the backstop date of 28 February 2025, due to the disclaimer of opinion for the 2022/23 period by our predecessor auditor. In our view, the effects of the resulting lack of assurance was pervasive to the financial statements as a whole. This meant that despite all the work we had undertaken, we also had to issue a disclaimed opinion on the 2023/24 financial statements.
We therefore concluded that we had not obtained sufficient appropriate audit evidence to enable us to express an opinion on whether the financial statements present a true and fair view and had been prepared, in all material respects, in line with the Code of Practice on Local Authority Accounting. Consequently, as required by the ISAs, we modified our audit report and issued a disclaimer of opinion. This means, in our audit report issued on 26 February 2025, we did not express an opinion on the Council’s 2023/24 financial statements.
In our Audit Strategy Memorandum 2024/25, dated 4 July 2025, we explained that we were hoping that guidance would be available to enable us to rebuild assurance for the disclaimed audit years (2022/23 and 2023/24) using a Proof in Total approach.
In our Audit Progress Report dated 9 November 2025, and presented to the Audit and Review Committee on 25 November 2025, we updated the Audit Strategy Memorandum by incorporating a significant audit risk on rebuilding assurance which had been missing from our original plan. At this point we were still awaiting guidance on the application of our audit approach, but on 5 December 2025, we reported via an e-mail update that the ‘rebuilding assurance’ guidance could not be issued, and that our firm alongside others in the sector, could not come up with a ‘proof in total’ approach that was consistent with the requirements of International Standards of Auditing (ISAs).
We agreed with management that we would seek to carry out a full audit of the 2022/23 financial year alongside the 2024/25 audit. This together with the work undertaken on the 2023/24 audit last year, would enable us to rebuild assurance over the opening balances and move towards issuing an unqualified opinion on the 2024/25 audit. This was only possible because there was only one disclaimed year to address (2022/23) and the Authority’s audit is relatively small compared to our other audits.
The Authority’s 2024/25 audit was the first backstopped audit where our firm had attempted to rebuild assurance using the historic testing approach. Our internal procedures required formal approval from our technical team to proceed with this approach. We received this approval. It required us to apply a lower level of performance materiality than we had initially planned, requiring larger sample sizes in our testing.
Audit status
Our audit procedures are now substantially complete for both the year ended 31 March 2023 and the year ended 31 March 2025. The procedures we undertook last year provided the assurance we needed in relation to the year ended 31 March 2024. Please refer to the ‘Status of our audit’ section for a list of significant audit matters outstanding at the date of this report. We will provide an update on completion of those outstanding matters by way of a follow-up letter.
We anticipate completing our work and issuing our audit report on 27 February 2026.
Areas of focus and audit approach, and significant findings
We did make changes to our initial risk assessment and planned audit approach that was communicated in our Audit Strategy Memorandum dated 4 July 2025 in relation to the 2024/25 audit. In our Audit Progress Report dated 9 November 2025 we rectified an omission from the Audit Strategy Memorandum and included rebuilding assurance as a significant audit risk. This was explained to Members of the Audit and Review Committee at its meeting on 25 November 2025.
A further change occurred on 5 December 2025, when it was agreed that we would also carry out a full audit of 2022/23. For our 2022/23 testing, we have applied the same materiality benchmarks, significant risks and audit approach as we have for our 2024/25 testing.
Our significant risks and other areas of focus are set out in the ‘Audit approach and risk summary’ section, with a summary of our audit approach over those areas. Significant findings from our audit are set out in the ‘Significant findings’ section.
Significant control deficiencies
We did not identify any significant deficiencies in internal control. Please refer to the ‘Significant control deficiencies’ section. We have not identified any non-significant control observations to date. This is set out in Appendix A.
The 2024/25 financial statements included a Prior Period Adjustment in relation to the 2023/24 financial statements to reflect corrections to accounting for the Grow Back Greener project. The Prior Period Adjustment was subject to a technical review by our specialist team. Amendments were made to the financial statements in respect of the Prior Period Adjustment, and this is explained further on page 25.
Although the reasons for the Prior Period Adjustment are indicative of a deficiency in internal control, we have not reported it as such. The reasons for us not reporting it separately are that management identified the errors itself and rectified them, including ensuring it was an isolated case and taking measures to prevent a recurrence.
Audit misstatements
A summary of the adjusted and unadjusted misstatements above our reporting threshold that have been identified to date are set out in the ‘Summary of misstatements’ section.
Audit opinion
At the time of issuing this report and subject to the satisfactory conclusion of our remaining audit work, we anticipate issuing an unqualified opinion, without modification, in relation to the Authority’s accounts as set out in Appendix C.
Value for Money
We anticipate having no significant weaknesses in arrangements or recommendations to report in relation to the arrangements that the Authority has in place to secure economy, efficiency and effectiveness in its use of resources. Further detail on our Value for Money work is provided in section 8 of this report.
Wider reporting powers
The 2014 Act requires us to give an elector, or any representative of the elector, the opportunity to question us about the accounting records of the Authority and to consider any objection made to the accounts. We received no questions or objections.
Whole of Government Accounts (WGA)
The Authority is exempt from making a submission of WGA consolidation data as it has Minor Body status. As a result of this, we do not need to complete and submit a WGA Assurance statement to National Audit Office.
Qualitative aspects of the Authority’s accounting practices
We have reviewed Authority’s accounting policies and disclosures and conclude that they comply with the 2024/25 Code of Practice on Local Authority Accounting, appropriately tailored to the Authority’s circumstances.
Draft accounts were received from the Authority on 30 June 2025 and were of a good quality. The working papers supporting the financial statements were comprehensive and we were provided with all of the information we needed. Management were exceptionally helpful in supporting the audit and responding to our audit queries.
Significant matters discussed with management
During our audit, we discussed the following significant matters with management:
- The Prior Period Adjustment relating to the Grow Back Greener Project; and
- Accounting for leases under IFRS 16, a new accounting standard from this year.
Significant difficulties during the audit
Subject to the completion of our remaining work, we have not encountered any significant difficulties and we have had the full co-operation of management.
Other matters of significance
Subject to the completion of our remaining work, we encountered no significant difficulties during our audit and had no significant disagreements with management. There was effective co-operation and communication between Forvis Mazars, management, and the Authority during our audit. All requested information and explanations were provided to us.
Other matters we are required by ISA (UK) 260 Communication with Those Charged with Governance to communicate to you have been set out in Appendix E.
2022/23 audit work
The matters reported in this document primarily relate to the 2024/25 financial statements and the Prior Period Adjustment relating to the 2023/24 audit.
We have also carried out a full audit of the 2022/23 accounts using the historic testing approach. The primary objective of this was to provide assurance on opening balances relating to the disclaimed audit year.
By full audit we mean, we carried out for 2022/23, the following:
- Complete balance sheet audit;
- Complete audit of income and expenditure accounts; and
- Complete audit of all remaining statements and notes.
We were able to obtain the assurance we needed over opening balances, meaning that we are now in a position to move from the disclaimed audit opinions of the last two years to an unqualified audit opinion for the 2024/25 audit.
We are grateful to management for supporting what was effectively an audit of two years undertaken in one year. The timescales were particularly challenging and it could not have been achieved without management support.
02 Status of the audit
Our audit work is substantially complete and there are currently no matters of which we are aware that would require modification of our audit opinion, subject to the satisfactory resolution of the outstanding matters set out below.
| Area | Status |
|---|---|
| Property, Plant and Equipment Valuations Our work is still ongoing. We need to obtain assurance over the accuracy and completeness of disclosures, as well as the method adopted. This affects a number of notes across the statement of accounts. | [Image: Green Circle] |
| Other audit areas We are continuing to complete and write up our work in a number of areas, although the scope for further issues arising is limited. | [Image: Green Circle] |
| Completion procedures Completion procedures will continue up to the point where we receive the final signed set of financial statements from the Authority and the signed letter of representation from management. These procedures include ongoing completion and review of our audit file, checking the final version of each set of the financial statements and considering any events after the balance sheet date up to the point that we issue our audit opinion. | [Image: Green Circle] |
| Value for money arrangements We have completed our work, but we will continue to assess arrangements up to the point of reporting which is planned by the end of February 2026. | [Image: Blue Circle] |
Status Legend:
- [Image: Red Circle] Likely to result in a material adjustment or a significant change to disclosures in the financial statements.
- [Image: Yellow Circle] Potential to result in a material adjustment or a significant change to disclosures in the financial statements.
- [Image: Green Circle] Not considered likely to result in a material adjustment or a change to disclosures in the financial statements.
- [Image: Blue Circle] Work on value for money arrangements
03 Audit approach and risk summary
Changes to our audit approach
We did make changes to our initial risk assessment and planned audit approach that was communicated in our Audit Strategy Memorandum dated 4 July 2025 in relation to the 2024/25 audit. In our Audit Progress Report dated 9 November 2025 we rectified an omission from the Audit Strategy Memorandum and included rebuilding assurance as a significant audit risk. This was explained to Members of the Audit and Review Committee at its meeting on 25 November 2025.
A further change occurred on 5 December 2025, when it was agreed that we would also carry out a full audit of 2022/23. For our 2022/23 testing, we have applied the same materiality benchmarks, significant risks and audit approach as we have for our 2024/25 testing.
Materiality
The materiality we applied to the 2024/25 audit was:
- Overall materiality: £280k
- Performance materiality: £168k
- Triviality – our reporting threshold: £8k
The materiality we applied to the 2022/23 audit was:
- Overall materiality: £243k
- Performance materiality: £145k
- Triviality – our reporting threshold: £7k
Audit risk summary
| Audit risk | Fraud risk | Judgement | Error | Conclusion | Page ref |
|---|---|---|---|---|---|
| Significant risks | |||||
| Rebuilding assurance | | | | Work is ongoing. At the date of this report, we have not identified any significant issues to report. | 13 |
| Management override of controls | | | | Work is complete. We have not identified any significant issues to report. | 14 |
| Valuation of Property, Plant and Equipment | | | | Work is ongoing. At the date of this report, we have not identified any significant issues to report. | 15 |
| Net defined benefit pension valuation | | | | Work is complete. There was an unadjusted misstatement relating to the 2024/25 assurance letter from the Pension Fund auditor. | 16 |
| Key area of management judgement | |||||
| Accounting for Leases (enhanced risk) | | | | Work is complete. A number of amendments were agreed to the disclosures to fully comply with the new requirements. | 17 |
[Legend: = High Risk/Focus, = Low Risk/Focus]
04 Significant findings
Significant risks
Rebuilding assurance
- Description of the risk: Government introduced measures intended to resolve the local government financial reporting backlog. Amendments to the Accounts and Audit Regulations required the Authority to publish its audited 2023/24 financial statements and accompanying information on or before 28 February 2025. The financial statements subsequently received a disclaimed audit opinion in 2023/24. As a result of the backstop arrangements, we determined that there was insufficient time to complete our audit procedures to obtain sufficient appropriate evidence, and, in our view, the effects of the resulting lack of evidence was material and pervasive to the financial statements as a whole. On 5 June 2025, the National Audit Office issued LARRIG 06. There is a risk that opening balances are materially misstated. The guidance introduces the concept of a Proof in Total approach.
- How we addressed this risk: The anticipated ‘rebuilding assurance’ guidance could not be issued. We subsequently agreed with the Authority that we would seek to carry out a full audit of the 2022/23 financial year alongside the 2024/25 audit.
- Audit conclusion: Work is ongoing. At the date of this report, we have not identified any significant issues to report.
Management override of controls
- Description of the risk: Management at various levels within an organisation are in a unique position to perpetrate fraud because of their ability to manipulate accounting records and prepare fraudulent financial statements by overriding controls that otherwise appear to be operating effectively.
- How we addressed this risk: We performed audit work over accounting estimates, significant transactions outside the normal course of business, and journal entries.
- Audit conclusion: Work is complete. We have not identified any significant issues to report.
Valuation of property, plant and equipment
- Description of the risk: The financial statements contain material entries in relation to the Authority’s holding of PPE. There remains a high degree of estimation uncertainty associated with the (re)valuations of PPE due to the significant judgements and number of variables involved.
- How we addressed this risk: We evaluated the design and implementation of controls, assessed the Valuer, tested data accuracy, challenged assumptions, and reviewed methodology.
- Audit conclusion: Work is ongoing. At the date of this report, we have not identified any significant issues to report.
Net defined benefit pension valuation
- Description of the risk: The financial statements contain material pension entries in respect of retirement benefits. There is a risk that the assumptions and methodology used in valuing the Authority's pension obligation are not reasonable or appropriate.
- How we addressed this risk: We assessed the Actuary, liaised with Pension Fund auditors, reviewed methodologies/assumptions, and agreed data to IAS 19 reports.
- Audit conclusion: Work is complete. There was an unadjusted misstatement relating to the 2024/25 assurance letter from the Pension Fund auditor.
Key areas of management judgment / enhanced risks
Accounting for leases under IFRS 16 (New for 2024/25)
- Description of the risk: IFRS 16 changes the definition of a lease compared to IAS 17. The Authority will recognise lease liabilities and corresponding right of use assets.
- How we addressed this risk: We critically reviewed the accuracy and completeness of the assessment and reviewed the accounting treatment for a sample of leases.
- Audit conclusion: Work is complete. A number of amendments were agreed to the disclosures to fully comply with the new requirements.
Wider responsibilities
Our powers and responsibilities under the 2014 Act include issuing reports in the public interest, making statutory recommendations, applying to court for declarations that an item of account is contrary to law, and issuing advisory notices. We have not exercised any of these powers as part of our 2024/25 audit. We have not received any questions or objections from electors.
05 Internal control conclusions
Significant control deficiencies
We did not identify any significant deficiencies in internal control as at the date of this report. A significant deficiency is one which has the potential for financial loss, damage to reputation, or loss of information affecting business strategic objectives.
Other observations
We also record observations where there is a need to strengthen internal control or enhance business efficiency that do not constitute significant deficiencies. We have not identified any such control deficiencies as at the date of this report.
06 Summary of misstatements
Unadjusted misstatements
Management has assessed the following misstatements as not being material and does not plan to adjust.
2024/25 financial statements
| Description | CIES Dr (£ ‘000) | CIES Cr (£ ‘000) | Balance Sheet Dr (£ ‘000) | Balance Sheet Cr (£ ‘000) |
|---|---|---|---|---|
| Dr. Pension Liabilities | 123 | |||
| Cr. Pension Reserve | 123 | |||
| The Pension Fund auditor identified an unadjusted difference in asset values... this is an understatement of asset values and is not material. | ||||
| Aggregate effect | 0 | 0 | 123 | 123 |
Adjusted misstatements
The following misstatements have been adjusted by management.
2024/25 financial statements
| Description | CIES Dr (£ ‘000) | CIES Cr (£ ‘000) | Balance Sheet Dr (£ ‘000) | Balance Sheet Cr (£ ‘000) |
|---|---|---|---|---|
| Dr. Long term leased assets liability | 139 | |||
| Dr. Current leased assets liability | 14 | |||
| Cr. Leased assets – right of use asset value | 153 | |||
| Amendments to 2023/24 Prior Year Accounts to reverse restatement of leased assets under IFRS 16, as the standard states changes are to be applied in 2024/25 only. | ||||
| Aggregate effect | 0 | 0 | 153 | 153 |
Disclosure misstatements
The following significant disclosure misstatements were corrected:
- Prior Year Adjustment – Restatement (Grow Back Greener): New note 5 added. 2023/24 balances restated. Creditors increased by £202k, debtors decreased by £18k. Usable reserves decreased by £220k.
- IFRS 16 Leases: Extensive changes to accounting policies and leasing notes to reflect the new standard and reverse the prior year restatement.
- Audit Fees: Updated to reflect the latest position.
07 Fraud considerations
[Image: A diagram showing the overall approach to fraud, consisting of: Inquire with management/Audit Committee; Evaluate selection/application of accounting policies; Assign and supervise appropriate audit personnel; Obtain written representation from management; Incorporate elements of unpredictability into audit procedures; Maintain professional scepticism.]
Our overall conclusion: We did not identify any actual or suspected fraud involving management, employees with significant roles in internal control or others, where the fraud resulted in a material misstatement in the financial statements.
08 Value for Money
Approach to Value for Money
We are required to form a view as to whether the Authority has made proper arrangements for securing economy, efficiency and effectiveness in its use of resources. The Code requires us to report under three criteria: Financial sustainability, Governance, and Improving economy, efficiency and effectiveness.
In our Audit Strategy Memorandum dated 4 July 2025, we reported that we had not identified any risks of significant weaknesses in arrangements.
Status of our work
We have completed our work for the year ended 31 March 2025 and we have not identified any significant weaknesses in arrangements that have required us to make a recommendation. Our draft audit report at Appendix C confirms that we have no matters to report in respect of significant weaknesses. Commentary will be provided in the Auditor’s Annual Report.
Appendices
A: Internal control conclusions (No observations identified) B: Draft management representation letter C: Draft audit report D: Confirmation of our independence E: Other communications
Contact: Gavin Barker, Director: Gavin.barker@mazars.co.uk Gaurav Gandhi, Audit Assistant Manager: Gaurav.Gandhi@mazars.co.uk
Appendix 2: YORKSHIRE DALES NATIONAL PARK AUTHORITY STATEMENT OF ACCOUNTS 2024/2025
Narrative Report - Highlights of 2024/25
- £2.45 million in grants paid to farmers through the Farming in Protected Landscapes (FiPL) programme.
- 92% of Public Rights of Way assessed as 'Easy to Use'.
- Over 7,900 people attended Authority events.
- Planning permission granted for 86 new dwellings.
- 44 traditional barns repaired, restored, or re-used.
Financial Summary
The net outturn position for the year is a positive variance of £888k. After carry-forwards, the final positive variance is £339k (2% of budget).
Usable Reserves: £4,706k Contingency Reserve: £1,313k (meets the 10% target)
Michelle Clyde S151 Treasurer 24 February 2025 (Draft) / 24 February 2026 (Approval)
Core Financial Statements (Summary)
Comprehensive Income and Expenditure Statement for year ending 31 March 2025
- Cost of Services: £5,834k
- Net Operating Expenditure: £5,821k
- National Park Grant: (£5,730k)
- Net Deficit on Provision of Services: £91k
- Total Comprehensive Income and Expenditure: £1,433k
Balance Sheet as at 31 March 2025
- Long Term Assets: £12,811k
- Current Assets: £6,678k
- Current Liabilities: (£2,080k)
- Long Term Liabilities: (£124k)
- Net Assets: £17,285k
- Total Reserves: £17,285k
Cash Flow Statement as at 31 March 2025
- Net Cashflows from Operating Activities: £903k
- Net Cashflows from Investing Activities: (£546k)
- Net Cashflows from Financing Activities: £176k
- Net increase in cash and cash equivalent: £532k
- Cash at end of period: £5,367k
Annual Governance Statement 2024/25
The Authority has approved and adopted a Local Code of Corporate Governance consistent with the CIPFA/SOLACE guidance. The governance framework has been in place throughout the year.
Key Matters identified:
- Local Plan: Draft Local Plan 2025-2040 expected to be published March/April 2025.
- Financial Sustainability: Balanced budget for 2025/26 using reserves due to anticipated decrease in core funding.
- External Audit: Handover to Forvis Mazars completed; audits are now up to date.
Mark Corner (Chair of Audit & Review Committee) & David Butterworth (Chief Executive Officer) 15 April 2025