Draft Action Plan 2026-27

Key: (p): postponed from 2025/26; (pp): postponed from before 2025/26; C: critical action

Home to the finest variety of wildlife in England

1. Priority: Support farmers and landowners to restore or create 500 hectares of new wildlife-rich habitats outside protected sites by 2030 (from a 2022 baseline)

Ref.ActionDueCritical
1.1Through the FIPL and farm advice teams support and promote applications to FiPL, SFI and Higher Tier schemes that create or restore 50 ha of new wildlife rich habitatMarC
1.2Through the Wildlife Rich Habitat Fund invest at least £900,000 in grants to support projects that create or restore priority habitat in the National ParkMarC

2. Priority: Support farmers and landowners to restore and manage landscape-scale mosaics of semi-natural habitat in one ‘nature recovery area’ (‘Tees-Swale’) and develop similar initiatives for at least 2 additional areas by 2030

Ref.ActionDueCritical
2.1Complete the final year of the Tees Swale Programme and produce a report on its legacySep
2.2Complete pre–development of the ‘Jewels of the Dales’ project, including activity to increase opportunities to engage diverse audiences, and prepare a development phase application for submission to NLHFMarC
2.3Work with partners and the farming community to develop a Landscape Recovery project in Littondale in preparation for a funding applicationMarC
2.4Work with partners to complete the pre-development phase of the proposed Coast to Coast nature trail project, including developing the engagement aspects of the future bidMar

3. Priority: Ensure that recovery plans are in place and being implemented for all ‘priority wildlife species’ by 2030

Ref.ActionDueCritical
3.1Assist the Biodiversity Forum in developing six species recovery plansMarC
3.2Implement a bat monitoring programmeMar

4. Work with farmers, landowners to improve the condition of rivers – including significantly reducing diffuse pollution from farming through the Catchment Sensitive Farming (CSF) programme

Ref.ActionDueCritical
4.1Run the CSF partnership, including 4 events on methods of reducing diffuse pollution and 1:1 support on soils, and work with 30 farmers to support uptake of SFI options and capital grantsMarC

Resilient and responsive to the impacts of climate change, storing more carbon each year than it produces

5. Priority: Work with farmers and landowners to encourage creation of 600 ha of native broadleaf and mixed woodland, including, scrub, wood pasture and natural regeneration by 2031, to create a network that increases resilience to climate change and reduce downstream flood peaks

Ref.ActionDueCritical
5.1With the White Rose Forest create at least 30 ha of native woodlandMarC
5.2Work closely with WRF and YDMT to develop a collaborative approach to woodland creation and establishment through Trees for Climate 2Mar
5.3Complete a review of the lessons learned from the ‘Grow Back Greener’ woodland creation programmeNov

6. Priority: Work with farmers and landowners to support food production through the use of regenerative farming practices, working with natural processes, across at least 40 farm holdings (c6,000 ha) by 2028

Ref.ActionDueCritical
6.1Develop and launch a YDNP regenerative farming project which will support at least 10 farms in its first year with their conversion to regenerative farming practices through advice and grant fundingMarC

A friendly open and welcoming place with outstanding opportunities to enjoy its special qualities

7. Priority: Manage and maintain the standard of all public rights of way, so that, on average, 90% remain ‘easy to use’

Ref.ActionDueCritical
7.1Agree the required specification for a new GIS-based, Access and RoW monitoring databaseOct
7.2Review delegation agreement with Westmorland & Furness CouncilDecC
7.3Carry out repairs to bridges at: Smither Gill (Winterburn); Coppy Gill (Selside); Reeth Suspension; and, Tommy Bridge (Dent)DecC
7.4Review all people counters to assess their purpose, location, performance, and value, and produce a recommendation for future monitoring of public rights of way and green lanesDec
7.5Carry out repair works across the National Park so that on average 90% of routes are ‘easy to use’MarC

8. Priority: Create 5 new ‘miles without stiles’ routes that are suitable for a diverse range of ages and abilities

Ref.ActionDueCritical
8.1Audit all Miles without Stiles routes and produce a costed plan for improving existing routes and developing new routes (p)JulC
8.2As part of the National Lottery Heritage Fund (NLHF) funded Access to Eden project, create a 1.5km ‘Miles without Stiles’ route at Smardale (pp)SepC
8.3Produce a costed scheme for a Miles without Stiles route from Kettlewell to BuckdenSep
8.4Complete phase 2 of the Cross Keys accessible trail project, carrying out works to improve 640m of bridleway and enhancing the road verge area (p)SepC
8.5Accessibility enhancements from Burnsall to Hebden Suspension Bridge via Loop ScarDec
8.6Investigate a new Miles without Stiles route from Linton car park to Linton Church and stepping stonesDec
8.7Through the Access to Eden Project, work with diverse range of community and user groups to develop ‘sensory trails’ at Smardale and PodgilMar

9. Priority: By 2030 work with 150 community groups to co-design activity days, support and training to help people from under-served communities to experience the special qualities of the National Park more easily

Ref.ActionDueCritical
9.1Create VR experiences that increase access to the National Park’s special qualitiesDec
9.2Review ‘Special Qualities, Special Experiences’ strategyJan
9.3Co-design activity days, support and training to enable at least 23 new community groups through externally funded projects such as Jewels of the Dales and Access to EdenMarC
9.4Work in partnership with the National Trust to pilot activities to connect and engage people with the Heart of the Dales Landscape Recovery Scheme areaMarC
9.5Develop a ‘Landscape for Everyone’ strategy that strengthens opportunities for people of all ages and backgrounds to experience, learn about and care for the National ParkMar

10. Priority: Provide curriculum-based outdoor learning and skills-based activities to enable 3,000 young people from in and around the National Park to explore and take action to enhance their environment each year, and embed youth participation in the work of the Authority and the National Park Management Plan Partnership

Ref.ActionDueCritical
10.1Hold a Skills Fair to introduce young people from under-served communities to volunteering and employment opportunities in the green sectorJul
10.2Act as lead Authority for the NPUK bid to the UK Fund for the ‘Our Natural Futures’ project to increase the diversity and scale of youth participation in National ParksDecC
10.3Provide outdoor learning and skills-based activities to 2,300 young people, including through projects such as Dales House BirdsMarC
10.4Support ‘Ambassador Schools’ to embed National Park outdoor learning and environmental education in their curriculum, enabling at least one school to plan an independent visitMar
10.5Run heritage-based activities for 700 young people at the Dales Countryside MuseumMarC
10.6Develop a climate change curriculum (p) and work with the Woodland Trust to develop climate-based educational resources for schools and groups to engage with the Woodland Trust site at SnaizeholmeMar

11. Priority: Help to tackle health inequalities and improve people’s health and well-being by enabling at least 1,500 people with health conditions to connect with and experience the special qualities of the National Park through ‘social prescribing’ activities by 2030

Ref.ActionDueCritical
11.1Extend the ‘Natural Health Service for North Yorkshire pilot’, running a 10-week programme of green social prescribing activities for adults experiencing mental and physical health challenges, low levels of physical activity, and social isolationMarC
11.2Develop and run a programme of ‘Breath of Fresh Air’ Walks for 120 people providing accessible, regular, guided walks starting from gateway towns and communities with good public transport linksMar
11.3Develop a National Park Nature Prescription Calendar for young people and familiesMar

12. Give people from all backgrounds an opportunity to enjoy and contribute to looking after the National Park by providing at least 5,000 volunteer days per year, with at least 20% coming from under-served communities by 2029

Ref.ActionDueCritical
12.1Review volunteer policy and practice, developing a more proactive approach to increasing volunteering diversity, delivering a wide range of accessible opportunities for volunteering (p)Jul
12.2Carry out a Member-led Performance Review of the volunteering serviceNov
12.3Support the CNPFE Community Champions to provide their volunteer community walk programmeDec
12.4Offer opportunities for 800 volunteer days for young people aged 13–25, through supported programmes such as Young Creatives, Young Rangers, Young Rangers in Schools, and Up Skill Down DaleMar

13. Enhance at least five ‘green lanes’ by 2030 and manage use by recreational motor vehicles and motorcycles - encouraging and supporting responsible use.

Ref.ActionDueCritical
13.1With North Yorkshire Council, carry out 1,350m of route enhancement works on the following green lanes: Turbary Rd, Cam High Road, Stake Road, Busk Lane, Heugh and Morpeth GateDec
13.2Collect data and conduct a walk over of Ravenstonedale Moor and the Highway (North) and produce an annual report on green lane usage and managementMar
13.3With the support of North Yorkshire Police, lead on ‘Operation Byway’ in the Northern area of the National Park, providing positive education and enforcement work on green lanesMar

14. Manage and promote the Pennine Way, Pennine Bridleway and Coast-to-Coast National Trails and other established long-distance routes, and improve linkages from the Coast-to-Coast route to 5 nearby settlements by 2030.

Ref.ActionDueCritical
14.1Carry out works and enhancements for the establishment of the Westmorland and Furness Way through the National ParkJun
14.2Establish the new Coast to Coast Path National Trail Partnership, with YDNPA as lead authoritySep
14.3Repair 1,850m of engineered routes on the Three Peaks, including routes at Beecroft and Grain IngsSep
14.4Repair section of the Pennine Way at Foss Gill, AirtonSep
14.5With partner organisations, review the Pennine National Trails Delivery FrameworkDec
14.6Create and sign a link route from Orton to the Coast-to-Coast PathDec

A distinctive living, working cultural landscape that tells the story of generations of people interacting with their environment

15. Priority: Support farmers and landowners to enhance the Dales’ landscape, and support nature, climate and farming resilience, including planting field trees to mitigate the impact of ash dieback on tree cover outside woodlands, and creating or restoring 20 km of hedgerows by 2028 (from a 2022 baseline).

Ref.ActionDueCritical
15.1Work with the Woodland Trust and partners to submit a bid to the National Lottery Heritage Fund for an Ancient Woodland revival projectJul
15.2Complete a light-touch review of the Dales Woodland Strategy (p)Sep
15.3With YDMT, FoBNL and Lune Rivers Trust, submit a full development phase bid to NLHF for the ‘Three Counties, One River’ project, focused on nature recovery and improving people’s access to nature in the middle and lower Lune catchmentNovC
15.4Work with land managers and through the Yorkshire Dales Millennium Trust to support the planting of 200 in-field treesMar
15.5Work with land managers and local community groups to support the creation and restoration of 2,500m of hedgerowMarC

16. Maintain the National Park as a place where a true sense of tranquillity and remoteness can still be found, including taking action to retain international ‘Dark Sky Reserve’ status

Ref.ActionDueCritical
16.1Co-ordinate data collection, prepare and submit the Dark Sky annual report to Dark Sky InternationalJan

17. Support farmers and landowners to conserve and enhance the distinctive landscape of field barns and drystone walls, so that at least one of the Barns and Walls Conservation Areas (Swaledale & Arkengarthdale and Littondale) is no longer at risk

Ref.ActionDueCritical
17.1Carry out an appraisal of the Littondale Conservation Area and publish a final draft for consultationMar
17.2Restore 5 traditional barns in the two B&W Conservation Areas using FIPL fundingMar

18. Help local people to record, restore, repair and – where possible - bring back into use historical sites, buildings and features

Ref.ActionDueCritical
18.1Work with Historic England and specialist contractors to complete enhancement of the Historic Environment Record for the Westmorland Dales, using LiDAR and aerial photography (pp)Sep
18.2Investigate with Natural England whether restricting public access to Victoria Cave would improve the condition of the SSSI feature; and determine an appropriate management responseDec
18.3Undertake early-stage development work with Yorkshire Peat Partnership for Historic Environment projects in the delivery stage of the Ure Dales LRPMar
18.4Develop and submit a bid to NLHF for a community archaeology project focused on the historic landscape of the Ingleborough areaMar

Providing an outstanding range of benefits for the nation based on its natural resources, landscape and cultural heritage, which underpin a flourishing local economy

19. Priority: Provide an efficient development management service that supports appropriate opportunities for economic and community development whilst helping to conserve and enhance the special qualities of the National Park, including ensuring that 65% of minor and 80% of ‘other’ planning applications are being determined within eight weeks and at least 80% of applicants are satisfied with the service provided

Ref.ActionDueCritical
19.1Publish a new Design Guide to support policies in the new Local Plan, and promote its useJul
19.2Determine at least 65% of ‘minor’ and 80% of ‘other’ planning applications within eight weeks or the time limit agreed with the applicantMarC

20. Priority: Establish an integrated National Park farm advisory service to: support regenerative farming; increase take-up of national agri-environment schemes and green finance opportunities; and so, support the viability and retention of low input livestock farming across the National Park

Ref.ActionDueCritical
20.1Review resource and skills within current farm team to inform the establishment of a fully skilled serviceJun
20.2With North Yorkshire Combined Authority and other partners, submit a bid to Defra’s Collaboration Fund for an upland farm advice ‘Pathfinder’MarC

21. Priority: Make the National Park more accessible to a diverse range of ages and abilities, including by providing 4 locations that all have ‘Changing Places’ accessible toilet facilities, all terrain mobility scooters, and ‘miles without stiles’ routes

Ref.ActionDueCritical
21.1Develop a fully designed and costed scheme for a Tramper route from Grassington Visitor Centre and install at least one Tramper on siteSepC
21.2Work with Yorkshire Water to investigate visitor access improvements at Grimwith and Embsay reservoirsNov
21.3Install an accessible toilet at Linton and investigate the feasibility of installing a Changing Place at Clapham and AysgarthDecC
21.4Investigate options for an accessible link from Malham village to the Landscape TrailMar
21.5Introduce new ways to make the DCM collection and themes more accessible for visitors with a visual impairmentMar

22. Encourage and support farms and estates to provide more opportunities for visitors and schools groups to experience the special qualities of the National Park, including establishing a ‘peer mentoring’ network to help build capacity by 2029.

Ref.ActionDueCritical
22.1Conduct an audit of farms and estates in the National Park to map existing school and community engagement provision, identify facilities and training needs, and highlight geographic and capability gapsMar

23. Develop and promote events and attractions based on the special qualities of the National Park that will be attractive to a new, more diverse and younger audience, so that 15% of visitors each year are coming for the first time.

Ref.ActionDueCritical
23.1Deliver the externally funded Art Fund Going Places programme, working with Young Creatives group to highlight the importance of outdoor spaces through a co-curated exhibition to be toured in 2026Dec
23.2Run 20 events for families at DCM to introduce the heritage of the National Park to a younger audienceMar

24. Improve the quality, sustainability and accessibility of the tourism ‘offer’ and information to encourage visitors to stay overnight, come ‘out of season’, and experience parts of the National Park that are currently less visited, so that the value of tourism grows by at least 5% in real terms by 2030.

Ref.ActionDueCritical
24.1Complete the commission to plan and re-design National Park Authority car parks, including enhanced EV charging, blue badge capacity and increased capacity overallAug
24.2Run the annual Cheese FestivalOct
24.3Run the annual Dark Skies Festival to highlight the importance of the National Park’s Dark Sky Reserve status, including two events at DCM and supporting two businesses to develop new events.Feb
24.4Develop and deliver a YDNPA ‘Welcoming Place Food Toolkit’ and training for tourism businessesMar

25. By 2030 provide at least 15 apprenticeships or traineeships, and wider programmes of training in land management, heritage and green skills, including the new skills needed by businesses to support more nature-friendly farming and tackle climate change

Ref.ActionDueCritical
25.1Recruit and support Youth Engagement Trainee and seek to appoint Countryside Worker apprenticeMar

Home to strong, self-reliant and balanced communities with good access to the services they need

26. Grant sufficient planning permissions (around 75) each year to support completion of 250 new dwellings by 2030, of which at least half will be social housing, affordable or local occupancy homes to attract and retain younger working age households

Ref.ActionDueCritical
26.1Complete Development Briefs for the larger allocated housing sitesJul
26.2Engage with landowners and builders to support proposals for 5 allocated housing sites.Mar
26.3Work with Councils, the Rural Housing Enabler and community-led housing initiatives to progress proposals for 5 affordable housing exception sites, particularly in the north of the National ParkMar

27. Increase the proportion of dwellings that are permanently occupied by requiring all new dwellings to be for principal occupancy

Ref.ActionDueCritical
27.1Adopt, publish and promote a new Local Plan for the whole of the National ParkJul

28. Support programmes of activity by other bodies to encourage sustainable development within the National Park, including initiatives that improve access to services, support green jobs and reduce greenhouse gas emissions

Ref.ActionDueCritical
28.1Co-ordinate and publish the first annual progress report on the 2025-30 National Park Management PlanSep
28.2Through the Sustainable Development Fund, provide £100k in grants to support at least 10 projects that deliver benefits for communities, visitors and the environmentMar

29. Develop and contribute to relevant local plans and projects to improve connections for walking, cycling, wheeling and horse-riding and create at least two new multi-use routes by 2030, including one linking Garsdale–Hawes

Ref.ActionDueCritical
29.1Prepare a delegated decision report to make a Public Path Creation Order for the Garsdale Hawes multi-user routeJul
29.2Complete feasibility studies to design stage for accessible, family-friendly link options from Garsdale station to the start of the proposed Garsdale-Hawes multi-user routeMar
29.3Work with NYC to resurface the public bridleway on the NCN route connecting Austwick to ClaphamMar
29.4Complete Year 1 of Active Travel England Capability Fund Phase 2, including prioritisation and integration of Active Travel Network Plan, development of feasibility stage design for Skipton-Grassington active travel corridor, and evidence gathering for two quiet lanes schemesMar
29.5Work with NYC to create a new pedestrian crossing in Threshfield, offering a safer walking route to Threshfield primary schoolMar
29.6Complete the preparatory works towards achieving planning and other consents necessary for the Garsdale Hawes multi-user routeMar

To be a highly effective organisation that delivers quality services and is widely recognised for its expertise in National Park policy, practice and partnership-working

30. Plan and manage the Authority’s work to make the most effective use of its resources, including generating sufficient income to maintain expenditure at the same level as 2014/15 in real terms

Ref.ActionDueCritical
30.1Prepare a programme of capital investments to support a greener, wilder, more accessible National Park and an initial pipeline of projects for subsequent yearsMayC
30.2Procure and appoint catering concession for DCM Café (3 years)Jul
30.3Produce the Medium-Term Financial Strategy for 2027/28 to 2029/30MarC
30.4Complete a major project review of the production of the National Park Management Plan 2025-30Mar

31. Provide high quality, efficient and effective services to the public and other stakeholders, achieving substantial assurance through an annual Customer Service audit

Ref.ActionDueCritical
31.1Complete a Customer Service audit and implement any significant recommendationsMarC

32. Operate governance arrangements that are fit for purpose, as reported through the Annual Governance Statement and Report

Ref.ActionDueCritical
32.1Complete internal and external audits, securing at least ‘Reasonable Assurance’JanC
32.2Complete the Annual Governance Report and publish the Annual Governance StatementMarC

33. Ensure that we have HR policies, procedures, terms and conditions to attract and support the right people with the right skills, core values and behaviours to deliver the Authority’s work effectively, as evidenced by accreditation under the Investors in People standard

Ref.ActionDueCritical
33.1Identify key recommendations from the Investors in People Action Plan to implement in 2026/27Aug
33.2Review and update the People StrategySep
33.3Continue to review and update HR policies/procedures, including Disciplinary and Grievance policiesMar

34. Provide facilities and IT systems that are fit for purpose and support the effective delivery of our services and high standards of health, safety and well-being

Ref.ActionDueCritical
34.1Replace the Colvend office (cottage) roof (p)Aug
34.2Complete refurbishment of Aysgarth NPVC toiletsOct
34.3Replace the back-up server and review back-up procedures and upgrade Legacy 2012 serversNov
34.4Review and update the Property StrategyDec
34.5Review the Procurement StrategyFeb
34.6Complete migration of all live documents to SharePoint to support more agile and collaborative workingMarC

35. By 2030, reduce greenhouse gas emissions from our operations by at least 95% compared to 2005/06

Ref.ActionDueCritical
35.1Explore the feasibility of installation of ground array of PV panels at Yoredale office and review electricity supply options including a move to a green electricity tariffMar

36. Provide high-quality, engaging communications to audiences in a variety of formats, including generating 2 million web views a year

Ref.ActionDueCritical
36.1Review the Media Procedure and ProtocolAug
36.2Complete the development, design and implementation of the new Authority websiteSepC