Skip to main content

Please be aware the content below has been generated by an AI model from a source PDF (opens in new tab) .

Yorkshire Dales Active Travel Plan

In June 2025, the National Park Authority approved its first Active Travel Plan.

The 10-year plan focuses on creating new routes and adapting existing rights of way for both recreational and everyday walking, wheeling, cycling and riding:

  1. Strategic multi-use routes (e.g. Kirkby Lonsdale – Ingleton, or Garsdale – Hawes)

  2. Local links, including safe routes to schools (e.g. Kirkby Malham school, Austwick - Clapham)

  3. Village or town walking zones, including safe road crossings (e.g. Threshfield/Grassington)

IMAGE: A family group cycling along a surfaced path through the Yorkshire Dales countryside, illustrating recreational cycling as one of the types of active travel supported by the plan.

Garsdale – Hawes multi-use route

IMAGE: An aerial view of green fields divided by dry-stone walls, with a grassy track running through the landscape towards a village, illustrating the rural setting of the proposed Garsdale–Hawes multi-use route.

The proposed route

IMAGE: A map covering the area between Garsdale and Hawes, showing the proposed bridleway route in bold black. The route runs broadly eastwards from Garsdale Head and Garsdale railway station, through the surrounding countryside and near Appersett, to Hawes. The map includes the labels “Proposed Bridleway Garsdale - Hawes”, “Garsdale”, “Garsdale Head”, “Garsdale Sta”, “Appersett”, “Hawes”, “Hardraw”, “Simonstone”, “Sedbusk”, “Mossdale Moor”, “Widdale Side”, “Widdale Fell”, “Widdale”, “Catterdale”, “Cotterdale”, “Fossdale”, “Hardraw Force”, “River Ure”, “A684”, “B6255”, and “© Crown copyright and database rights 2025 Ordnance Survey AC0000819132”. The scale bar is marked “0”, “1”, and “2 km”.

Progress to date

  • Early 2020 – Authority commissioned a feasibility study for establishment of the multi-use route.

  • March 2022 – Authority approved the principle of creating the multi-use route, requesting a public consultation.

  • June 2022 – Public consultation held with over 2,200 responses. 72% of all respondents were supportive, 82% of those living or working in the National Park were supportive.

  • Late 2023 – Agents appointed to contact landowners to discuss proposals with view to securing access through creation agreements.

  • Sep 2025 – Authority approved officers to progress preparations to make a public path creation order.

Creation Agreements

  • 10 (of 20) landowners agreed ‘in-principle’ to offer access.

  • 5 negotiations on-going.

  • Remaining landowners have clearly stated their objections or have been unresponsive.

  • Proposed route requires all landowners to agree.

IMAGE: A rural grassy track beside a dry-stone wall, leading through a valley with trees, fields and hills, illustrating the type of countryside through which the proposed route would pass.

Public Path Creation Order

What is a Creation Order?

What is the process?

IMAGE: A rural unsurfaced track beside a dry-stone wall, leading through green fields towards trees, farm buildings and hills, illustrating the type of existing path or route relevant to a public path creation order.

Next Steps

  • Continue dialogue with landowners.

  • Consult with local highway authorities and other interested organisations, in advance of making creation order.

  • Preparation and assessments for planning and other consents required.